This was a conversion from a mental health NHS building to a 15 room student accommodation and a communal kitchen.

We took control of the electric design and install, along with the CCTV to ensure the safety of the students, we also ran all the cabling for the data install too.

The job was designed, installed and commissioned within 3 months so it was a very high pressured job.